服务热线

Overhead Crane Types Explained: Single Girder, Double Girder And Underhung Designs

The overhead crane is the default lifting machine in manufacturing plants, warehouses and machine shops, yet the term covers a wide family of machines that differ dramatically in structure, load capacity and installation method. Choosing the wrong configuration usually does not fail immediately; it shows up later as excessive deflection, slow cycle times, difficult maintenance access or a demand for frequent modification. This guide works through the main overhead crane types, explains how the load path runs through the structure, compares top-running and underhung arrangements, and sets out the practical selection and installation considerations that decide whether a machine suits the duty in front of it.

What Makes A Crane An Overhead Crane

An overhead crane is a lifting machine whose load is carried by a beam or pair of beams supported at both ends, with the crane travelling along a fixed elevated runway rather than on the floor.

That single structural fact drives most of the design decisions. The runway has to be level and aligned to a tolerance measured in millimetres, the building columns have to be stiff enough to resist the horizontal reactions generated by acceleration and braking, and the crane has to be designed so that any deflection stays within limits that keep the hook from swinging excessively. Every type of overhead crane is a different answer to the same three questions: how much capacity, over what span, and how often will it be used.

Single Girder And Double Girder Configurations

The most fundamental classification is whether the bridge has one girder or two. A single girder crane has one load-bearing beam with the trolley running on top of it, and the hoist is mounted between the trolley and the girder or on the trolley itself.

Single girder machines are lighter, cheaper to install and faster to commission, and they suit moderate loads over short or medium spans. Double girder machines carry more load, tolerate longer spans, provide better access to the trolley and hoist for maintenance, and offer more stability under large loads. The trade-off is cost, weight and the space they need for the runway beam and building support.

AttributeSingle girder overhead craneDouble girder overhead crane
Typical capacity rangeFrom under one tonne up to roughly five tonnes in common industrial configurationsFrom a few tonnes up to several hundred tonnes depending on span and duty
Typical working spanApproximately 5 to 25 metresApproximately 10 to 40 metres and beyond
Structural depthShallower; the trolley sits on top of the girderDeeper; the trolley runs between the girders
Hook approachRestricted; the load sits close to the girder, so side approaches are limitedFull approach from the sides, useful for picking from racks or bins
Runway beam requirementLight rail or box section on building columnsHeavier rail and stronger column brackets
Installation effortQuicker, often feasible inside a running plantLonger; usually needs a planned shutdown window
Best suited toWorkshops, small assembly areas, general warehouse handlingHeavy fabrication, steel mills, machine shops, high-throughput production lines

These ranges describe typical practice rather than fixed limits. Capacity and span are connected by the girder design, the material grade, the deflection limit and the duty class, so an extreme combination of high capacity and long span may fall outside the standard range for a given girder type. Any selection should be confirmed against the manufacturer's load chart for the exact configuration.

Top Running And Underhung Arrangements

Where the crane hangs changes the building requirements as much as the machine itself. In a top-running arrangement the crane is carried on rails that sit on top of the runway beams, so the full crane height adds to the available hook height. This is the standard arrangement in manufacturing plants and gives better clearance, easier wheel maintenance and a stiffer runway.

In an underhung arrangement the crane hangs below the runway beams on wheels running along the lower flange, with the trolley also suspended beneath. This keeps the floor completely clear and requires only a modest beam depth, which is why underhung cranes dominate in workshops where floor space is precious and the ceiling is low. The trade-off is reduced hook height below the beam and a lower working speed in many configurations.

FactorTop running overhead craneUnderhung overhead crane
Runway beam depthTypically 400 to 900 mm or more, depending on span and loadTypically 200 to 400 mm, since the beam carries a lighter load
Hook height availableHigher; the crane sits above the beam and adds to the liftLower; the trolley and hoist hang below the beam
Footprint on the floorColumns or support brackets occupy floor spaceFloor stays completely clear
Wheel maintenanceWheels are on top and reachable from a platformWheel changes need access beneath the beam, often from a ladder
Load stabilityHigher, because the girder is stiffer and the hook sits further from the beamLower; greater sway is common with long travels
Typical applicationsProduction lines, heavy fabrication, shipyards, machine shopsLight assembly, warehouses, small workshops, retail back-of-house

How The Load Path Works

Understanding the load path explains most of the terminology used in overhead crane specifications. The load hangs from the rope, which passes over the sheaves in the hoist mechanism and the trolley before being anchored at the drum or gearbox. The hoist force is carried into the trolley frame, which distributes it to the two trolley wheels and from there into the main girders.

Each step in that chain has a capacity and a deflection limit, and a crane is only rated for the weakest element in the series. Deflection is just as important as strength. If the girder sags noticeably under load, the rope angle changes, the hook swings and the load becomes difficult to place accurately. Sway is the practical symptom of a structure that is strong enough but not stiff enough.

This is also why the trolley position matters. A trolley parked at mid-span loads the girder most severely, while a trolley close to the end truck produces lower mid-span bending but higher end reaction. Runway stiffness, girder deflection and hook height therefore have to be considered together rather than separately, and this is why a crane specified for one span is not simply interchangeable with the same model over a longer span.

Hoist And Drive Configurations

The hoist is where the money and the maintenance effort sit. Electric travelling hoists with a cylindrical or conical rotor motor are the most common in general industry, valued for compactness, simple control and straightforward maintenance. Wire rope hoists provide higher duty capacity, better speed control and faster lifting speeds, which matters in high-cycle applications.

On the drive side, a single motor driving the hoist gearbox is the simplest arrangement, while dual-motor drives split the load across two motors and are common on higher-capacity machines to reduce gearbox size and improve duty capability. Travel drives for the bridge and trolley may be friction-wheel or gear, with the friction type suited to medium duty and the gear type used where higher speeds and better acceleration control are needed. Controls range from pendant control to radio control, and radio control is increasingly preferred where a pendant cable would become a trip hazard or where the operator needs a clear view.

Hoist typeTypical capacity bandStrengthsLimitations
Cylindrical rotor electric hoistFrom under one tonne to about ten tonnesCompact, economical, simple parts and straightforward repairHigher speeds are harder to achieve; slower cycle rates
Conical rotor electric hoistAround one to thirty tonnesSmoother speed control and better handling at higher capacitiesRequires more careful commissioning and speed adjustment
Wire rope hoistSeveral tonnes to several hundred tonnesHigh duty capability, good speed range, robust rope handlingLarger mechanism, rope and drum maintenance
Chain hoistTypically below a few tonnesCompact, precise low-speed control, small drumChain wear, lubrication and sprocket inspection required

Selecting Capacity, Span And Duty Class

Nominal capacity is only the starting point. The working load is rarely the heaviest thing lifted, and the real requirement is the maximum static and dynamic load the machine will ever see, including the weight of the rigging and any imbalance in the load.

Duty class describes how hard the machine works. A crane used a few times a day for light loads sits in a low duty class, while a machine in a production line that cycles continuously with heavy loads needs a high duty class, more robust components, higher duty motors and more frequent maintenance. Span affects the girder design, so a decision to extend the crane coverage later may mean replacing the runway and the crane rather than simply adding a section of rail. These interactions are why selection work belongs to someone who can weigh the whole picture, and why quotations should always state the span, the lift height, the duty and the power supply.

Installation And Commissioning Considerations

Installation quality determines whether a well-chosen crane performs as designed. The runway must be surveyed and levelled, and the rail alignment tolerance is normally expressed in a few millimetres per metre of run.

During erection the beams are usually lifted into position and aligned before the wheels are finally set, and the sequence has to be planned around the production schedule. Commissioning then covers mechanical alignment of the end trucks and trolley, rope tensioning and reeving, brake adjustment, limit device setting, overload calibration, the function test of every safety device and the trial load. Only after a successful test should the crane be released for production use, with the documentation and the certification package completed for the site safety file.

One practical point is worth emphasising: keep the runway, the crane and the process layout aligned in the same revision. A machine installed to a layout that is about to change will need modification later, and modifying an installed crane is far more expensive than specifying it correctly at the start.

Matching The Machine To The Application

The right overhead crane is the one whose configuration matches the physical constraints of the site rather than the one with the longest specification list. General warehouse and workshop handling with moderate loads and short cycles suits a single girder top-running or underhung machine with a cylindrical rotor hoist. Continuous heavy production with wide hook approach requirements points to a double girder configuration with a wire rope hoist and dual-motor drive.

Whatever the class, the specification should always state the working span, the lift height, the hook approach required, the duty class, the power supply and the operating environment, since ambient temperature, dust, humidity and corrosive atmospheres all influence the components that should be specified. Confirming these before the quotation is prepared avoids the expensive pattern of buying a standard machine and adapting the building to fit it.

Conclusion

Overhead cranes differ far more than the shared name suggests. Single girder and double girder designs, top-running and underhung arrangements, and cylindrical rotor, conical rotor, wire rope and chain hoists each trade cost, speed, capacity and hook height in different combinations, and the correct choice is decided by the span, the duty cycle, the available hook height and the way the load must be approached.

8 次

相关文档